Registration No. 207154
Activity areas: Engineering procurement and construction (EPC)
Managing Directors: Mohammad Reza Mesdaghi
Chairman: Nooralah Abedi
Voice Chairman: Mohammad Fakhrayan
All the unique words of the company before and after the establishment of various industrial projects in Iran served
test.
Petrochemical project Borzoye- Arak Machine Manufacturing
Fourth aromatic project
And spherical storage tanks

Electrical and Instrumentation and fire system

I estimate Power: 160000

Check Project

100 percent progress
Project started: First Persian date Aban 1383
Check the project: First Persian date Dey 1384




Described work done:

1 - 6 kilometers galvanized pipe for fire fighting system and install fire equipment
2 to 40 tons of fire equipment installation
3-23 km of cable tray for instrument systems
4-7 km of terrestrial channel lighting system, Fayralarm Vhfazt Cathodic
5-260 km 380 volt power cable (lighting - control and ...)
6-80 number of street lights with bridge and foundation
100 to 60 * 60 * 40cm * 40cm * 50cm 7 - install 600 concrete foundation number of dimensions
8 - install Aynstrvmnt number 800 with accessories including air tube - Tube and ...
9 - Pre-commissioning and commissioning fire system
10 - Pre-commissioning and commissioning electrical system
11 - pre-launch instrument system.
12 - installation, pre-commissioning and commissioning Cathodic Protection System